What matters should be paid attention to during the assembly process of container hotel houses?
2024-01-08

1. The ceiling of the container hotel should be of a fixed structure. When installing lamps and other lighting equipment, attention should be paid to whether the specifications are appropriate and the tightness of the structure of the house itself cannot be destroyed.

2. The appearance and frame of the container sandwich panel are made of steel. When decorating, the indoor insulation problem must be taken into consideration to prevent the house from being exposed and causing leakage and other undesirable conditions.
3. After the container is installed, users cannot change the structure of the container without authorization, nor can they dismantle any accessories at will. They cannot add or reduce partition walls without authorization. If changes are needed, they need to consult with someone before proceeding.
4. In addition, users must maintain and maintain the containers and refresh them with paint every two years.
Before building a container in Chengdu, you have greater flexibility in choosing the materials used to assemble the container. You can change the materials used to assemble the container in Chengdu according to different user needs. If you want to use it as a kitchen, you can choose rock wool color steel plate materials. Chengdu assembles containers because this material has good fire protection properties.
1. The installation of steel parts must comply with the regulations. Do not ignore the parts that require welding, and do not weld incorrectly, which may cause instability or even cracking in the later stages.
2. The wall surface should be installed horizontally, the caulking should be dense and smooth, the dark and light seams should be of the same width, and the surface should not be damaged.
3. If wallpaper is required in the room, make sure it is smooth, bubble-free, and clean.
4. The ceiling should be assembled with straight seams and gaps, the wallpaper should be clean and tidy, and there should be no damage to the surface. Any damage to the wallpaper surface during transportation should be repaired.
5. The concrete floor paving should be kept dusty. It is strictly forbidden to install and use concrete floors with cracks on the surface.
6. The overall surface of concrete or pisolite concrete should be smooth and dense, and should not have defects such as cracks, peeling, sanding, and wall hollows.
7. Asbestos tiles must be paved downwind according to local wind frequency characteristics, and the eaves must be kept vertical. The tiles must not have cracks. The length of the longitudinal steel bar overlap of the asbestos tiles must be no less than 100 mm, and the horizontal steel bar overlap must be medium-wave. The tile should have no less than one wave, and the small corrugated tile should have no less than 2 waves. Each asbestos tile has two support points on the tile hook. The tile hook should be tightened appropriately, and there should be no water seepage on the flat roof.
8. The container galvanized iron drainage ditch connectors are welded firmly, and the joints must be anti-corrosion. There must be no water in the drainage ditch, and there must be no leakage. The drainage pipes should be installed vertically and firmly, with hoops spaced 1300mm apart.
9. Install the window and door parts and tighten them with anchor bolts.
10. Residential containers can be moved and purchased at any time.