What inspections are required for the frame installation of container mobile homes?
First, the foundation and partition walls around the site to be installed should be level. The material usually used is reinforced concrete, which can be stronger. Then stand upright and connect the frame with cross beams. After that, the floor is laid, and if a multi-layer floor is required, the roof trusses and roof panels are installed after the floor is fixed, doors and windows are installed, vertical brackets and other components are pulled, and the small hardware required for supporting sanitary ware is installed.
Check the quality and safety of the frame installation of the container mobile house. Since the container mobile house is a light steel structure, the installation process is similar to a heavy steel structure factory building. Each process of the mobile house will be covered up by the next process during the construction process, so Many parts cannot be inspected after they are completed.
In view of this, after the installation of the foundation part of the mobile house is completed, carefully check whether all parts are firmly connected and the quality and safety of the mobile house.