Projects
Focus on the optimization and innovation of the
container modular construction industry
Projects > Projects > Lecong Dragon Boat Training Base
    Lecong Dragon Boat Training Base
    Project information
    Designer Guangdong StaxBond Construction Technology Co., Ltd
    Project category Container Dragon Boat Cultural Exhibition Hall
    Building area 600 square meters
    Floor area 350 square meters
    Project duration 25 days for box production+on-site construction
    Project Year October 2020
    Constructor Guangdong StaxBond Construction Technology Co., Ltd
    The overall structure adopts stacking and overhead structures to diversify the space transformation. The exterior walls use traditional blue bricks instead of corrugated container boards, creating a classical and traditional atmosphere.

    Features
    It has a dragon boat team living building, a dragon boat culture exhibition center, a dragon boat racing exhibition hall, a dragon boat team physical training hall, a dragon boat equipment room, a dragon boat station, a dragon boat pier, etc. It integrates dragon boat training, training, tourism, experience, cultural exchange, and dragon boat product display. As one body.



    微信图片_202202231741405.jpg
    4dd55942b7661e99797786c4e897026.jpg
    9b29c27240847fc23bfa76aad455a98.jpg
    508349d4725afedd39d49f7face4410.jpg
    739951be5509b57991afe20d0ad46b7.jpg
    967918508a14328bcc9f8a192bb9760.jpg
    ed8f3858ac4770c751ee1513d637ec4.jpg