Lecong Dragon Boat Training Base
Project information
Designer
|
Guangdong StaxBond Construction Technology Co., Ltd
|
Project category
|
Container Dragon Boat Cultural Exhibition Hall
|
Building area
|
600 square meters
|
Floor area
|
350 square meters
|
Project duration
|
25 days for box production+on-site construction
|
Project Year
|
October 2020
|
Constructor
|
Guangdong StaxBond Construction Technology Co., Ltd
|
The overall structure adopts stacking and overhead structures to diversify the space transformation. The exterior walls use traditional blue bricks instead of corrugated container boards, creating a classical and traditional atmosphere.
Features
It has a dragon boat team living building, a dragon boat culture exhibition center, a dragon boat racing exhibition hall, a dragon boat team physical training hall, a dragon boat equipment room, a dragon boat station, a dragon boat pier, etc. It integrates dragon boat training, training, tourism, experience, cultural exchange, and dragon boat product display. As one body.